John's Autobody Cone Zone Report

City Of Minot

-Periodic Single Lane Closures: 12th St NW between 17th Ave NW and Glacier Dr. Intersection of 12th St NW and Glacier Dr

-Local Traffic Only Allowed:23rd St NW between 11th Ave NW and 7th Ave NW

-Parking Restrictions:8th St NW between 21st Ave NW to 27th St NW

-Lane Closure: Traffic will be reduced to head-to-head traffic on EW Burdick surrounding 27th Street SE.~16th Street SW from Burdick Expwy to 5th Avenue SW.

-Road Closure: Northbound and southbound 27th St SE at E Burdick Expwy.---~7th Street SW South of 31st Ave SW to 32nd Ave SW. ~3rd Avenue SE between 2nd Street SE and 3rd Street SE.~16th Street SW between 11th Avenue SW. ~16th Avenue SW 16th Street SW between 18th Avenue SW and 20th Avenue SW.~The 19th Avenue NW access on the west side of US Highway 83 Northwest Bypass is closed -the access is anticipated to be reopened by in July 2020 flaggers will be present. Intermittent closures along US Highway 83 Northwest Bypass at the intersections of 4th Avenue NW, 19th Avenue NW, 21st Avenue NW, 30th Avenue NW, 16th Street NW, 8th Street NW and US Highway 83.~Intersection of 31st Avenue SE and 13th Street SE Intersection of 31st Avenue SE and 11th Street SE 6th Street SE between 28th Avenue SE and 31st Avenue SE.~16th St SW to 17th St SW: Closed indefinitely.

-Detours: Southbound 27th St SE: Utilize 4th Ave SE to 31st St SE to E Burdick Expwy to 8th Ave SE to Valley St to 27th St SE Northbound 27th St SE: Utilize Valley St to 8th Ave SE to E Burdick Expwy to 31st St SE to 4th Ave SE to 27th St SE

-Flashing Lights: SE Intersection on 6th Ave and 3rd St NE (near Karma Convenience Store)

-Pedestrian Walkway Closure: The pedestrian walkway underneath the railroad tracks just south of 4th Avenue NE, near the 3rd Street bridge underpass, is currently closed.

-31st Avenue Southwest scheduled to close at 7th Street intersection.

As construction continues on the storm sewer project in southwest Minot, a roadway closure is scheduled to allow for the installation of new storm sewer pipe across 31st Avenue SW. Beginning Monday, June 22, 31st Avenue SW will be closed at the intersection of 7th Street SW. Local traffic will still be able to access businesses and streets on either side of 7th Street SW but traffic will not be able to go through the intersection. Through traffic is encouraged to utilize either Broadway or 16th Street SW to 37th Avenue SW.

The closure is anticipated to last until midweek, at which time the roadway, with a gravel surface, will reopen to traffic. Paving on 7th Street SW, 31st Avenue SW, and 10th Street SW north of 31st Avenue is anticipated to be completed mid-July.

More information about the project can be found at minotnd.org/10thstreet.

State:

-Work Zones:

Reduced to one lane from Blaisdell to 4 miles West of Berthold

4th AVE NW to JCT US 83

Reduced to one late Calgary AVE to Wilton

Reduced to one lane from Mauvais Coulee to JCT 19 WB

-4 Bears Bridge:

The bridge is open but construction on the bridge will continue most of the summer with reduced traffic speeds, please adjust schedules accordingly.